Interior of the Torrevieja desalination plant, which plans to increase its production capacity from 80 to 120 cubic hectometres per year. /
The expansion of the three large plants is stagnant; Torrevieja does not have water orders from irrigators for this quarter
The subsidized price of desalinated water has yet to be approved, so the signing of the contracts with Acuamed is still pending. Along with this, the Segura Hydrographic Confederation (CHS) has not yet granted future concessions for these resources to irrigators. The result is that the additional desalinated water offered by Minister Teresa Ribe
Already a subscriber? Log in
#desalination #offered #Ribera #pending #price #contracts #Acuamed