Egyptian President Abdel Fattah El-Sisi inaugurated today the electric train project and Adly Mansour Central Station.
The cost of the LRT electric light rail project “Adly Mansour – Administrative Capital – Tenth of Ramadan” is approximately $2.2 billion, after extending the route of the line to reach 90 km, instead of 68 km, as 4 stations were added in the Administrative Capital and a station in the Tenth of Ramadan to reach The number of its stations to 16 instead of 12, and the distance from the start of the line for the light rail project, Adly Mansour Central Station, to the Arts City in the New Administrative Capital, is cut in about 50 minutes, according to the Egyptian Al-Ahram Gate website.
While inspecting the driver’s cabin on the train, accompanied by the Minister of Transport, Lieutenant General Kamel Al-Wazir, who told him about the most prominent means of technology that were added on the train, including installing a camera to monitor the driver and monitor his behavior. Do you smoke? The driver replied, “No, sorry.”
#Sisi #told #electric #train #driver