Adif places the ‘cover’ of the future underground station in Murcia
Foundation works for the slab that covers the future Carmen station. In the foreground, the dismantled tracks. / JOSE LUIS ...
Foundation works for the slab that covers the future Carmen station. In the foreground, the dismantled tracks. / JOSE LUIS ...
Archive image of the sewage and stormwater collector works in the underground area of the train tracks. / ROS CAVAL ...
Works for the railway platform line. / AdifThe new HSL is part of the Mediterranean Corridor, a critical infrastructure for ...
Adif works in Barriomar in a file image. / NACHO GARCIA / AGMThe Infrastructure Manager lowers the underground level by ...
Construction of the underground screens next to the Carmen station, in the direction of Barriomar.The arrival of the AVE to ...
Image of the Reguerón pergola. / ADIFIt will invest 155 million in a new double track platform between Torre Pacheco ...
Emmaus Building / ALFONSO DURANThe biggest stumbling block occurred in the Orilla de la Vía collector, in Barriomar, and it ...
Interior of the laboratory train, which last night focused the tests on the high-speed rail catenary between Beniel and El ...
A train from the Cartagena-Murcia line, circulating yesterday through the Pozo Estrecho and La Palma level crossing. / JM RODRIGUEZ ...
The development of the high-speed rail network will take 23.5 billion until 2025between works in progress (11,500 million) and projects ...
Email us: [email protected]