Tesla has paid 37 million pesos as environmental compensation due to the change in land use for its installation in Mexicoas reported in various media, this means one more step for the construction of the Ggigafactory.
The electric car plant that Elon Musk decided to locate in Santa Catarina in New Lion progresses in the procedures, the exact figure is 37,543,564.94 pesos, destined for the Mexican Forest Fundcorresponding to 260 hectares, where 130 will be for construction.
According to images that are quickly becoming popular on the web, there is a document from the Ministry of the Environment and Natural Resources of the state of Nuevo León where it was from the beginning of December 2023 that authorized the Land-use change.
What will be done with the money that Tesla gave?
The procedure in Semarnat It began on July 31, 2023 and it was not until December 7 that the payment for environmental compensation was notified to be used for reforestation or restoration activities and their maintenance in an area of 1,147.6 hectares of rosetophilous desert scrub, preferably in the State of Nuevo León.
The 37,543,564.94 pesos that the state of Nuevo León received from tesla They will also be used for rescue and compensation actions for a catalog of 228 species of flora found on the land, as well as to care for its fauna and hydrological basin. The Gigafactory contemplates starting operations by 2027.
How much money did Tesla receive for arriving in Mexico?
Previously, there was also talk of the money that the state of Nuevo León granted to Tesla and there was talk of an amount of 2.63 billion dollars, which means, 153 million pesos in incentives from the Mexican state of Nuevo León to build the next Gigafactory.
The incentive was approved by the state economic development councilAs stipulated, such an amount was considered for the creation of basic infrastructure such as roads and water treatment, as well as a reduction in the payroll tax, as reported by the Government of Nuevo León.
The news was released after Elon Musk requested in 2023 that New Lion improve electrical, water and transportation infrastructure in the region before starting construction.
Tesla still needed a series of local and federal permits, such as that from the Energy Regulatory Commission, to build and operate the Nuevo León factory. For his part, the owner of the CFEManuel Bartlett, explained in the famous La Mañanera press conference that support already existed for the installation of electrical energy for the Tesla plant.
The manufacturer of electric cars has said it will invest about $10 billion in the factory over several phases. Tesla's initial investment will be $4.5 billion, according to the Government of Nuevo León.
#Tesla #gave #million #pesos #Mexico #electric #car #plant #money