The summer in Mexicoand in addition to the typical tips to save electricity, there is a service made available by the Federal Electricity Commission (CFE) so that users can save money on their electricity bill, and we will tell you what it is right away.
Under this understanding, one of the services that most helps in saving on the electricity bill issued by the Federal Electricity Commission (CFE) is the installation of solar panels in houses.
{{title}}
{{/main}}
Interconnection contract signing
In this sense, if you want to install solar panels, you must sign an interconnection contract with the Federal Electricity Commission (CFE).
Taking the above into account, it should be noted that there are three types of interconnection contract with the Mexican State electricity company, and they are the following:
*Net Metering of Energy (Net Metering): the CFE client consumes and generates energy in the same supply contract. This energy is subtracted from consumption.
*Net Billing: the electricity consumed that the State electricity company gives to the customer is independent of the energy that the customer generates and sells to the Federal Electricity Commission; That is, it does not subtract from your consumption.
*Total Energy Sale: the client sells all the energy it generates to CFE. Here there is no supply contract between the client and the State company.
Meanwhile, once the user has chosen one of the contracts for the interconnection of solar panels, he will have to submit an application to the electricity company, which can be found on the official website of the Federal Electricity Commission, in a center corporate customer service.
Requirements
For its part, once at the CFE customer service center, the following will have to be presented: requirements:
*Sketch of geographical location of your home.
*Single-line diagram of the power plant to be installed.
*Technical sheet of the generation technology used.
*Certificate of the power inverter (if applicable).
*Copy of the last receipt if you are already a client of CFE Basic Services Supplier.
Costs
On the other hand, it must be emphasized that the aforementioned procedure is gratuitous, although it is required to carry out an interconnection study or works on the CFE electrical network, a price that is borne by the interested person. Concluding the process, you can go for your new interconnection contract.
Finally, we must not overlook the fact that the interconnection of the solar panels with the CFE service can take up to 13 business days, this if no works or studies are required, since if Thus it may take up to 18 business days.