Industry Metso Outotec receives EUR 23 million contract in Turkey

Metso will supply a siderite calcination plant in Malatya, Turkey, for EUR 23 million.

Metso Outotec has signed a € 23 million contract with Turkey.

A company specializing in the mining, metals and crushing industries will supply a siderite calcination plant to Koloğlu Holding’s subsidiary Hekimhan Madencilik in Malatya, Turkey.

The delivery includes the design, manufacture and delivery of the system and equipment, as well as advisory services during the installation of the plant.

Department the annual capacity is 600,000 tons of calcined siderite. The main components of the system are the rotary kiln, the radiator and the heat recovery and gas cleaning equipment.

The plant is expected to be ready for use in the second half of 2023.

Metso Outotec is the world’s leading supplier of calcination systems.

#Industry #Metso #Outotec #receives #EUR #million #contract #Turkey

See also  HS Hyvinkää | A small Finnish design shop became amazingly popular in Japan - Then the popularity stopped like a wall

Related Posts

Next Post

Leave a Reply

Your email address will not be published. Required fields are marked *

Recommended