Inter and Milan will formalize the project by Christmas: it will be played starting from 2027
Milan will have a new Cathedral. Nobody is scandalized: the Scala del calcio is and will always remain the Meazza but the new stadium of Inter and Milan will still have a unique shape. The one designed by the architects of the American studio Populous, inspired by the Duomo and the Galleria Vittorio Emanuele II, to which the Nerazzurri and Rossoneri have entrusted the construction of the arena that from 2027 will host the home matches of the Milanese. There is still much discussion and discussion about the future of the Meazza, which at the moment should be partially demolished after the 2026 Winter Olympic Games (the opening ceremony will take place here) and converted into a “sports and commercial district”, but in the meantime Inter and Milan take another step forward. For months, the Populous project seemed to have a clear advantage over the Manica-Sportium’s Rings of Milan, now the official status is also in the pipeline, which in the intentions of the two companies will arrive by Christmas, therefore in the next 24-48 hours.
THE DISTRICT
–
The American studio, which has designed over 3000 sports projects and designed more than 1000 stadiums, including the Sydney 2000 and London 2012 Olympics, the new Wembley and the ultra-modern Tottenham di Conte arena, opened in September in Milan. the twenty-first world headquarters and now he will throw himself headlong into the realization of the executive project, the new necessary step after the political okes arrived from the Municipality of Milan. Yesterday, while Mayor Beppe Sala said “if anyone wants the Meazza for rent, I’m willing to collaborate”, Inter and Milan held yet another meeting at Palazzo Marino. Now the theme that remains on the table is the construction of the San Siro district, that is everything that will arise around the new stadium, with the construction sites that will start only after Milan-Cortina 2026: to have the municipal pass, the clubs have halved the concrete to favor of greenery, thus falling within that volumetric index of 0.35 which excludes the construction of towers, hotels and gigantic shopping centers in the Meazza area. Also for this reason the two managers, with the CEO in the lead. The Nerazzurri Alessandro Antonello and the Rossoneri president Paolo Scaroni are working to reshape the financial plan of the entire project, which at the beginning of the ride was worth 1.2 billion euros.
ECO FRIENDLY
–
In the meantime, however, the choice of Populous gives a precise address. Unveiled in September 2019, the Cathedral has, as it appears in the renderings, a great appeal: it is a stadium never seen before and responds to the desire of the two managers to have a truly modern project in their hands. From the almost 80 thousand spectators of the Meazza, this will increase to a maximum of 65 thousand in the new stadium. A precise choice, with many more executive seats than today to increase earnings: it is estimated that from 2027 Inter Milan and Milan will be able to derive at least 80 million each year from the stadium. A gallery will surround the entire Cathedral, which will be wrapped in a glass facade and is designed to be the most eco-sustainable facility in Europe. Furthermore, thanks to technological installations, the stadium will become Nerazzurri and Rossoneri depending on the team that will play and will be eco-sustainable. The tunnel will be naturally ventilated and solar panels will be integrated into the roof of the building. A jewel, even if replacing the Meazza will certainly not be an easy task.
December 21, 2021 (change December 21, 2021 | 08:25)
© REPRODUCTION RESERVED
.
#cathedral #Milan #Populous #San #Siro