Bridge over the Strait, new grain: too low. But it’s too late to change everything
A new problem arises relating to Bridge over the Straitthis time it is directly the Ministry of Transport and Infrastructure led by the leader of the League Matteo who raises it Salvini. MIT lets it be known – and Repubblica reports it – that on the basis of official project a sensational figure has been estimated, the bridge would be “too low for cruise ships and container ships to pass“. In 2023 alone, five cruise ships and 15 container ships transited the Strait, but if the bridge had been there this would not have been possible. The president of Federlogistica Luigi raised the issue – continues La Repubblica Blackbird. The CEO of the Stretto di Messina company Pietro Pacifiers he had denied.
But today the Ministry of Infrastructure and Transport admits it. “New interventions – according to the MIT – would entail an increase in costs and times. Why more than half of the large vessels under construction have a height that is not compatible with the Bridge“. “A bridge is not being built, but a wall on the Strait“, denounces the Democratic Party. “A suspension of the entire process can no longer be postponedit is necessary to block everything, open an in-depth discussion in Rome, with the involvement of the government, the competent parliamentary commissions, the presidents of the Southern Regions, the administrators of the territories involved, the intermediate bodies, the parties and civil society”.
#Bridge #Strait #MIT #alarm #cruise #ships