The Roads and Transport Authority in Dubai has awarded a contract for the Umm Suqeim Street development project, from its intersection with Al Khail Road to its intersection with Sheikh Mohammed bin Zayed Road, at a cost of 332 million dirhams, in implementation of the directives of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE. The Ruler of Dubai, may God protect him, by completing the development of the road network infrastructure, to keep pace with the continuous development witnessed by the Emirate of Dubai, to accommodate the needs of urban development and population growth, to enhance the flow of traffic, and to follow up with His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of the Council. Executive.
The Director-General and Chairman of the Board of Directors of the Roads and Transport Authority, Mattar Al Tayer, said: “The Umm Suqeim Street development project is one of the most important strategic projects to develop the transverse road axes (east-west) to enhance connectivity with the vertical roads (north-south), and its implementation comes as a continuation of Due to the Authority’s efforts in developing this axis, in 2013 it completed the expansion and development of Umm Suqeim Street from its intersection with Sheikh Zayed Road to its intersection with Al Khail Road, where two bridges with a capacity of three lanes in each direction, and three pedestrian bridges were implemented. The Authority also implemented within the bridges project And the roads leading to (Dubai Hills Mall), a bridge on Umm Suqeim Street at its intersection with the entrance to the Dubai Hills and Al Barsha areas.
Enhance connectivity
Al Tayer added: “The Umm Suqeim Street development project extends from its intersection with Al Khail Road to its intersection with Sheikh Mohammed bin Zayed Road, with a length of 4.6 kilometers, and includes developing the intersection of Umm Suqeim Street with Al Barsha Street to the south, specifically near King’s School, through the construction of a tunnel. It is 800 meters long, with a capacity of four lanes in each direction on Umm Suqeim Street, and the establishment of a surface intersection controlled by a traffic light.
He stressed that the project contributes to enhancing connectivity between four strategic axes in the Emirate of Dubai, which are: “Sheikh Zayed Road, Al Khail Road, Sheikh Mohammed bin Zayed Road, and Emirates Road, and increasing the road’s capacity to reach 16,000 vehicles per hour in both directions, and achieving traffic flow.” The journey time in the section extending between Sheikh Mohammed bin Zayed and Al Khail Streets was reduced from 9.7 to 3.8 minutes, and serves many residential and development areas, the most important of which are the first, second and third areas of Al Barsha South, and the Dubai Hills area, with an estimated population of about two million people.
Completed projects
It should be noted that in 2013, the Roads and Transport Authority completed the first phase of the Umm Suqeim Street development project, in the section extending between Sheikh Zayed Road and Al Khail Road, and included the implementation of two bridges with a capacity of three lanes in each direction, the first crossing the eastern street parallel to Al Asayel Street, and the second. It crosses the western street parallel to First Al Khail Street, in addition to constructing two signalized intersections at the intersections of Umm Suqeim Street with Al Asayel Street and First Al Khail Street. It also included the implementation of three pedestrian bridges on Umm Suqeim Street, to facilitate pedestrian crossing between the Al Quoz and Al Barsha areas, and in 2020, the authority opened Within the Dubai Hills Mall bridges and roads project, there is a main bridge along Umm Suqeim Street at its intersection with the entrance to the Dubai Hills and Al Barsha areas, with a length of 500 metres, a capacity of four lanes in each direction, and a capacity of 16,000 vehicles per hour in both directions.
#Development #Umm #Suqeim #Street #cost #million #dirhams