More than 30 km of roads have been built in Moscow, the annual plan has been completed by almost half. This was announced on September 11 by the deputy mayor of the capital for urban policy and construction, Andrey Bochkarev.
“To date, 30.8 km of new roads, 10 overpasses, overpasses, tunnels and bridges have been built in the capital,” he is quoted as saying. website mayor.
A number of key road facilities were opened in Moscow for City Day. Among them are an overpass on the Moscow Ring Road near the intersection with Verkhnie Polya Street, a road junction at the intersection of the Moscow Ring Road with Ostashkovskoye Highway, and a section of Kokoshkinskoye Highway from Minskoye Highway to Kokoshkino.
A section of the Moscow High-Speed Diameter (MSD) from Yaroslavskoye to Dmitrovskoye Highway was also opened. The commissioning of the route was the last link in the construction of the main section of the Moscow High-Speed Diameter – the North-Eastern Expressway.
On September 8, Russian President Vladimir Putin launched car traffic in the Moscow, Sverdlovsk and Chelyabinsk regions. In particular, the first section of the M-12 Moscow-Kazan highway under construction was put into operation on the territory of the Moscow Region.
On August 10, the president took part in the opening ceremony of the Arkhangelsk bridge in the Vologda region via video link. The new automobile route, which was launched simultaneously with the bridge, created conditions for the active development of territories beyond the Sheksna River and connected four large microdistricts of Cherepovets.
#roads #built #Moscow #beginning #year